News Update

Musk defers India’s trip citing heavy Tesla obligationsIndia needs to design legislative pills to euthanise tax-induced expatriation!I-T- Exercise of jurisdiction u/s 263 is invalid if AO has taken particular view, which though, may not be only view, but certainly can be possible view : ITATTorrential rains cause havoc in Pakistan; 87 killedI-T- Additions framed on account of unexplained money upheld as assessee was unable to prove source of cash deposited in assessee's bank account : ITATUS imposes sanctions on 3 Chinese firms and one from Belarus for transfering missile tech to PakistanCX - Appellant has regularly filed statutory returns on monthly basis and the fact of clearance of goods and availment of credit was duly reflected in returns but same has not been examined by authorities below, impugned order is not sustainable: CESTATDubai terribly water-logged as it has no storm drainsST - When services are received from separate source & accounted separately in separate ledgers, there cannot be any question of clubbing them under one category: CESTATEU online content rules tightened against adult content firmsCus - The continuous suspension of license of Customs Broker without either conducting an inquiry or issuing a notice for revocation of license or imposition of penalty is bad in law and needs to be set aside: CESTATEV market cools off in US; Ford, GM eyeing gas-powered trucksApple China tosses out WhatsApp & Threads from App store after being orderedChina announces launch of new military cyber corpsRailways operates record number of additional Trains in Summer Season 2024GST - Assessing officer took into account the evidence placed on record and drew conclusions - Bench is, therefore, of the view that petitioner should present a statutory appeal: HC1st phase polling - Close to 60% voter turnout recordedMinistry of Law to organise Conference on Criminal Justice System tomorrowGST - To effectively contest the demand and provide an opportunity to petitioner to place all relevant documents, matter remanded but by protecting revenue interest: HCGovt appoints New Directors for 6 IITsNexus between Election Manifesto and Budget 2024 in July!Israel launches missile attack on IranEC holds Video-Conference with over 250 Observers of Phase 2 polls
 
New Terminal under Jal Marg Vikas Scheme to be launched in Jharkhand

By TIOL News Service

NEW DELHI, SEPT 10, 2019: THE Prime Minister Mr Narendra Modi will dedicate to the nation India's second riverine Multi Modal terminal built at Sahibganj in Jharkhand on 12 September, 2019.  The Prime Minister will inaugurate the state of the art terminal through a two -way digital communication system at an event in Ranchi, Jharkhand. The Minister of State for Shipping (Independent Charge) and Chemical and Fertilizers Mr Mansukh Mandaviya will be present at Sahibganj, Jharkhand.

Built at a cost of Rs 290 crores in a record time of about two years, the Prime Minister himself had laid the foundation stone of IWAI's Sahibganj multimodal terminal in April, 2017. This is the second of the three Multi Modal Terminals being constructed on river Ganga under Jal Marg Vikas Project (JMVP).  Earlier, in November, 2018 the Prime Minister had inaugurated the MMT at Varanasi.

The Multi-Modal terminal at Sahibganj will open up industries of Jharkhand and Bihar to the global market and provide Indo-Nepal cargo connectivity through waterways route. It will play an important role in transportation of domestic coal from the local mines in Rajmahal area to various thermal power plants located along NW-1. Other than coal, stone chips, fertilisers, cement and sugar are other commodities expected to be transported through the terminal.

The multi-modal terminal will also help to create direct employment of about 600 people and indirect employment of about 3000 people in the region. The convergence of Road-Rail-River Transport at Sahibganj through the new multi-modal terminal will connect this part of the hinterland to Kolkata, Haldia and further to the Bay of Bengal. Also, Sahibganj will get connected to North-East States through Bangladesh by river-sea route. It

The capacity of the terminal is 30 lakh tonnes per annum. It will grow to 54.8 lakh tonnes per annum after an investment of Rs 376 crores for capacity enhancement in Phase II under PPP mode. The development in Phase II will be entirely made by the private concessionaire. Further, a freight village is also proposed on 335 acres of land in contiguity with the terminal.

Salient features of Sahibganj Multi Modal Terminal

Second Multi-Modal Terminal on National Waterway -1 (river Ganga)

Cost of Phase-I of MMT:  Rs 290 Cr

Start date of the project: 10 November, 2016

Completion date of the project: September, 2019

Jetty: Length 270 m x Width 25 m with berthing and mooring facility.

1 Mobile Harbour Crane

The MMTs are being built as part of the Jal Marg Vikas Project that aims to develop the stretch of River Ganga between Varanasi to Haldia for navigation of large vessels upto1500-2000 tonnes weight, by maintaining a drought of 2-3 metres in this stretch of the river and setting up other systems required for safe navigation. The objective is to promote inland waterways as a cheaper and more environment friendly means of transport, especially for cargo movement. Inland Waterways Authority of India (IWAI) is the project Implementing Agency.


POST YOUR COMMENTS
   

TIOL Tube Latest

Shri N K Singh, recipient of TIOL FISCAL HERITAGE AWARD 2023, delivering his acceptance speech at Fiscal Awards event held on April 6, 2024 at Taj Mahal Hotel, New Delhi.




Shri Ram Nath Kovind, Hon'ble 14th President of India, addressing the gathering at TIOL Special Awards event.